Completion date: May 20, 2017
Location: Philadelphia, PA
The challenges we faced were removing all the finished material to access the foundation floor-wall joint.
To address this, we installed a full perimeter GrateDrain drainage system with a full FinishShield vapor barrier on the walls and a GrateSump.